Data centre migration and server relocation, planned and done for you
We move your equipment from your current data centre into our racks in the Amsterdam region: audit and planning, de-rack, transport, install, connect and verify.
How does the move work, step by step?
- 01
Plan
We audit your equipment and plan the move with you.
- 02
Move
We de-rack, pack and transport your equipment, with replacement equipment for the duration of the move, where technically possible.
- 03
Test
IncludedYour equipment is tested before it goes live and recorded at intake: serials, rack position, port map, power feed, photos.
- 04
Install
IncludedRacked and stacked, with structured power and data cabling, patch cords and labelling.
- 05
Connect
Connected and verified.
- 06
Live
IncludedRunning. Your spare parts wait on our shelf, and your inventory is updated after every job.
Questions about equipment migration?
How much does a migration cost?
A migration is priced per project. Tell us what you need to move and when, and we reply with a price.
Who moves the equipment?
We do. We de-rack, pack and transport your equipment from your current data centre into our racks in the Amsterdam region.
How do you keep downtime short?
We audit your equipment and plan the move with you, and we provide replacement equipment for the duration of the move, where technically possible.
What happens when my equipment arrives?
It is tested before it goes live and recorded at intake: serials, rack position, port map, power feed, photos. Then it is racked and stacked, with structured power and data cabling, patch cords and labelling, connected and verified.
Are testing and installation included?
Yes. Installation, cabling, testing and inventory are part of the colocation rate.